Closing Up
From the floor to the attic, various trades worked to finish up all
the rough work in preparation for closing up the walls with sheetrock.
Concrete
Alex filled the two holes in the kitchen floor. No more dirt for Muir
to dig in; no more holes to fall in.

HVAC
The guys from Kamor relocated the ducts in the attic and the pipes
and conduits that connect the air conditioner with the compressor unit.
Since it was added on in the '80s, those pipes were on the outside of
the house; now they'll be hidden inside the wall.

Electrical
Ken completed the rough electrical work in the kitchen.

And in the dining room, Ken installed a few receptacles, switches,
and a box for an exterior porch light.
Framing
Bob and John prepared the upper playroom wall to accept sheetrock,
and prepared the window sill to accept a granite top.